
Train the whole team before the next inspection
A team licence from five learners. Each learner has their own login, progress and certificate, and you see who has started and who has completed. Hosted on The GMP Training Academy.
Against the classroom course you were quoted
Budget holders compare on total cost, not list price. This does the comparison honestly, including the time your people spend away from the line.
Compare with the classroom course you were quoted
Enter your numbers. Nothing is stored. Time off site is counted for both options, and the online course is charged at its 2 hours of study, not zero.
- Classroom fees (12 × €1,400)
- €16,800
- Classroom time off site (12 × 2 d × €450)
- €10,800
- Classroom total
- €27,600
- Online seats (12 × €145, 5 learners and above (team licence), 19% off)
- €1,740
- Online study time (2 h each)
- €1,440
- Online total
- €3,180
You keep
€24,420
and nobody leaves the site for two days before the inspection.
Trained people make fewer defects, close faster and stay.
Regulators treat training as part of the quality system, not a favour to staff: EU GMP Chapter 2 requires it, requires its effectiveness to be assessed, and requires the records to prove it. The evidence says the same thing in numbers. Below: what the published studies found, what it looks like on your data integrity KPIs, and the clause behind it.
41%
fewer quality defects
in the most engaged teams compared with the least engaged, across 112,000 business units. Engagement and development opportunities are measured together. [1]
26%
greater ability to deliver quality products
in organisations with a strong learning culture compared with those without. [2]
37%
higher employee productivity
in the same strong-learning-culture organisations; output per person, not hours. [2]
94%
would stay longer
of employees, at a company that invests in their learning. Retention is the quality metric nobody puts on the dashboard. [3]
The data integrity KPIs a trained team moves
These are the numbers a QA head reports at management review and an inspector asks for when the audit trail comes up. No invented percentages here: measure yours before and six months after, and you will have your own.
- 01
Audit trail review backlog
Measured as: % of scheduled reviews overdue
Lower is better
Reviewers who know what a risk-based review looks for finish it in the time allowed instead of scrolling every entry. Reviews happen on schedule; the backlog an inspector finds first stops accumulating.
- 02
Records corrected per GDocP
Measured as: % of corrections compliant on sampling
Higher is better
Single line, original legible, initialled, dated, reason given. Once everyone does it the same way, the correction itself stops being the finding.
- 03
Shared or generic account use
Measured as: count of active shared logins per system
Lower is better
People who understand why attributability matters stop lending passwords and report the shared login instead of working around it. System owners get the request to fix it before the inspector does.
- 04
Data integrity deviations
Measured as: count per quarter
Lower is better
Fewer late entries without justification, fewer unexplained reprocesses, fewer records with missing signatures. The deviations that remain are the real ones, not the avoidable ones.
- 05
Late entries with justification
Measured as: % of late entries carrying a reason and a true date
Higher is better
Contemporaneous is taught as a habit, and when it fails the entry says so honestly. A late entry with a justification is a record; a backdated one is a finding.
- 06
Retention failures found at audit
Measured as: count of records not retrievable within the retention period
Lower is better
Owners know what must be kept, for how long and in what form, including the metadata and the audit trail. Records are still there, and still readable, when the inspector asks for them.
Train the team on the records they sign
About two hours each, with a certificate and a verifiable ID for every learner.
Sources
- [1]Gallup (2020). The Relationship Between Engagement at Work and Organizational Outcomes: Q12 Meta-Analysis, 10th edition. 112,312 business units in 96 countries. Top-quartile business units on engagement showed 41% fewer quality defects, 81% lower absenteeism and 18% to 43% lower turnover than bottom-quartile units. Cross-industry meta-analysis. Gallup's engagement measure includes development and learning opportunities.
- [2]Bersin and Associates (2010). High-Impact Learning Culture: The 40 Best Practices for Creating an Empowered Enterprise. Organisations with a strong learning culture were 26% more able to deliver quality products, showed 37% greater employee productivity and were 46% more likely to be first to market. Cross-industry survey of about 40,000 organisations.
- [3]LinkedIn Learning (2018). Workplace Learning Report: The Rise and Responsibility of Talent Development in the New Labor Market. 94% of employees would stay longer at a company that invested in their career development. Cross-industry employee survey.
- [4]EudraLex Volume 4, EU Guidelines for Good Manufacturing Practice, Part I, Chapter 2: Personnel (2013), paragraphs 2.10 to 2.13. ICH Q10 Pharmaceutical Quality System (2008), section 2.4 Resource management. The regulatory requirement for training and for assessing its effectiveness.
Seats, oversight, records
- A team licence from 5 learners, bought online with a VAT invoice in your company name
- Each learner gets their own login, progress and certificate
- You see who has started and who has completed: the training record for your file
- Certificates with verifiable IDs an auditor can check
Per seat, by tier
| 1 to 4 learners | List price | €179 |
| 5 learners and above (team licence) | 19% off | €145 |
Tiers apply at checkout on the academy. Site-wide and multi-course agreements on request.
Tell us the seat count and the deadline
A person replies within two working days with a quote, or you can buy seats directly on the academy.